JSW Infrastructure announced on 9 June 2026 that it has received a Letter of Award from the Syama Prasad Mookerjee Port Authority (SMPA), Kolkata, for the Outer Container Terminal and Berths 1 to 5 at Netaji Subhas Dock.
The Rs 832.25 crore project runs for 30 years on a Design, Build, Finance, Operate and Transfer (DBFOT) basis under the PPP mode.
It covers two new outer container berths and the takeover of five existing berths, with a combined capacity of about 0.93 million TEUs (around 13 million tonnes a year).
With its earlier Berth 7 and 8 project (0.45 million TEUs), JSW's capacity at the Kolkata Dock System will reach about 1.4 million TEUs.
India's oldest operating port (1870) and its only riverine major port, on the Hooghly about 203 km from the sea. Two wings: Kolkata Dock System and Haldia Dock Complex. Renamed from Kolkata Port in 2020. Under the Ministry of Ports, Shipping and Waterways.
Ports and logistics arm of the JSW Group; private port operator and concessionaire for the project.
Replaced the Major Port Trusts Act, 1963, turning port trusts into port authorities with more autonomy — including powers to fix tariffs and award PPP concessions such as this one.
Under DBFOT the private concessionaire designs, builds, finances and operates the asset, pays the port a royalty, and hands it back when the concession ends. A TEU (twenty-foot equivalent unit) is the standard measure of container capacity.
Simple Analogy: Like building a shop on leased land, running it for 30 years, then returning it.
The Kolkata Dock System sits on the Hooghly river in Kolkata and includes Kidderpore Dock and Netaji Subhas Dock. The port's second wing, the Haldia Dock Complex, is downstream in Purba Medinipur district, closer to the Bay of Bengal.
General Awareness > Ports of India and static GK
Twenty-foot equivalent unit — the standard unit of container capacity.
Design, Build, Finance, Operate and Transfer — a PPP concession in which the asset returns to the public authority at the end.