The National High Speed Rail Corporation Limited (NHSRCL) has invited rolling-stock manufacturers for capability assessment and presentations on designing and building trains for 350 kmph in India — the B35 project.
B35 trainsets are planned with a design speed of 350 kmph and an operating speed of 320 kmph, for the future high-speed corridors.
Firms must confirm participation by 10 July 2026; presentations are scheduled for 17-18 July 2026.
Union Budget 2026-27 announced seven new high-speed rail corridors of nearly 4,000 km, at an estimated cost of about ₹16 lakh crore.
The earlier B28 trainset (design speed 280 kmph), being built by BEML and the Integral Coach Factory, is due for trials on the Mumbai-Ahmedabad corridor, whose Surat-Vapi section is targeted for August 2027.
High-speed rail corridors announced in Union Budget 2026-27
| No. | Corridor | Projected travel time (Railway Minister, February 2026) |
|---|---|---|
| 1 | Mumbai – Pune | 48 minutes |
| 2 | Pune – Hyderabad | 1 hour 55 minutes |
| 3 | Hyderabad – Bengaluru | 2 hours |
| 4 | Hyderabad – Chennai | 2 hours 55 minutes |
| 5 | Chennai – Bengaluru | 1 hour 13 minutes |
| 6 | Delhi – Varanasi | 3 hours 50 minutes |
| 7 | Varanasi – Siliguri | Not confirmed |
| Feature | B28 | B35 |
|---|---|---|
| Design speed | 280 kmph | 350 kmph |
| Operating speed | About 250 kmph | 320 kmph |
| Builder | BEML with Integral Coach Factory (ICF) | To be selected; capability assessment under way |
| Stage | Prototype trials planned in 2027 on the Mumbai-Ahmedabad corridor | Presentations by manufacturers on 17-18 July 2026; targeted for 2030 |
| Intended use | Mumbai-Ahmedabad corridor | Future high-speed corridors |
Implements India's high-speed rail projects; incorporated on 12 February 2016 as a joint venture of the Government of India (Ministry of Railways) with the Governments of Gujarat and Maharashtra
Public sector undertaking under the Ministry of Defence; building the B28 high-speed trainsets at its Bengaluru plant
Indian Railways production unit, set up in 1955; partner for the B28 trainset and maker of the Vande Bharat trains
NHSRCL incorporated
Union Budget 2026-27 announces seven new high-speed rail corridors
NHSRCL's invitation to manufacturers for a 350 kmph train is reported
Last date for firms to confirm participation
Manufacturer presentations
Target for opening the Surat-Vapi section of the Mumbai-Ahmedabad corridor
GS Paper III > Infrastructure: Railways; indigenisation of technology
General Awareness > Indian Railways current affairs
Planned indigenous high-speed trainset with a design speed of 350 kmph and operating speed of 320 kmph.
Indigenous high-speed trainset with a design speed of 280 kmph, being built by BEML and ICF.
Train Control and Management System — the on-board electronics that monitor and control a train's subsystems.