The Union Cabinet on 1 July 2026 approved two highway projects worth ₹14,114.81 crore in Delhi and Uttar Pradesh.
An 8.1-km six-lane tunnel on NH-148AE (₹6,969.67 crore, Hybrid Annuity Mode, about five years) will link Dwarka Expressway with Nelson Mandela Marg, Vasant Kunj; 1.98 km of its twin-tube section runs beneath the Southern Ridge Forest.
The 117.7-km, 4/6-lane access-controlled Kanpur-Kabrai section of NH-34 (₹7,145.14 crore) forms part of the Bhopal-Kanpur Economic Corridor and is to be built by NHAI in BOT (Toll) mode.
The UP highway is expected to cut Kanpur-Kabrai travel from about 3.5 hours to 1.5 hours.
Under HAM the government pays 40% of project cost during construction and the rest as annuities; NHAI collects toll, so the developer bears no traffic risk. Under BOT (Toll) the concessionaire finances, builds and collects toll, bearing traffic risk.
Simple Analogy: HAM is a salaried builder; BOT is a builder who earns from the shop's sales.
The Delhi Ridge is the northern tail of the Aravalli range; its Southern Ridge stretch around Vasant Kunj and Mehrauli is one of the city's largest green lungs. Kabrai lies in Mahoba district of Bundelkhand, linking Kanpur to Madhya Pradesh via the corridor.
GS Paper III > Infrastructure — roads, investment models (PPP, HAM, BOT)
General Awareness > Government decisions
Who was the Minister of Science and Technology (as of 2024 question context)?
Answer: Dr. Jitendra Singh
40% government funding during construction, 60% by the developer recovered through annuities
Private developer builds, operates and collects toll for a concession period, then transfers the asset
Entry and exit only at designated interchanges