The Ministry of Rural Development has notified the Schedule of Permissible Works under the VB-G RAM G Act, 2025, listing 375 works, 41% more than the 266 allowed under the earlier framework
The works sit under four pillars: Water Security (128), Core Rural Infrastructure (111), Livelihood-related Infrastructure (98) and Special Works for Extreme Weather Events and Disaster Preparedness (38)
Disaster preparedness gets a dedicated category for the first time, and livelihood works rise from 1.1% of the list to 26%
Every work must come from a Viksit Gram Panchayat Plan approved by the Gram Sabha and is tracked on the Viksit Bharat National Rural Infrastructure Stack
Schedule of Permissible Works under VB-G RAM G: 375 works
| Pillar | Works | Examples named by the Ministry |
|---|---|---|
| Water Security | 128 | Check dams, gully plugs, underground dykes, recharge shafts, injection wells, river and nallah rejuvenation, drip and sprinkler systems, rooftop rainwater harvesting, tankas, ice stupas |
| Core Rural Infrastructure | 111 | Solar street lights, waste-to-wealth recycling plants, greywater treatment units, rural libraries, veterinary and health centres, Common Service Centres, classrooms and school laboratories |
| Livelihood-related Infrastructure | 98 | Agro-processing and packaging units, cold storage, mini flour mills, market yards, dairy infrastructure, sericulture sheds, poly-houses, SHG worksheds, SHE Marts |
| Special Works for Extreme Weather Events and Disaster Preparedness | 38 | Flood relief shelters, retaining walls, embankment strengthening, post-disaster road restoration, forest fire lines and fuel-buffer zones |
| Aspect | MGNREGA, 2005 | VB-G RAM G Act, 2025 |
|---|---|---|
| Guaranteed work | 100 days a year per rural household | 125 days a year per rural household |
| In force | 2 February 2006 | 1 July 2026 |
| Funding | Demand-based central funding | Centrally Sponsored Scheme on normative allocation: 60:40, 90:10 for North-Eastern and Himalayan States, 100% for UTs without legislature |
| Permissible works | 266 | 375, in four pillars |
| Disaster works | No dedicated category | 38 works in a dedicated category |
| Livelihood works | 1.1% of the list | 26% of the list |
Statutory guarantee of 125 days of unskilled wage work per rural household, tied to durable assets
Key: Bill introduced in Lok Sabha 16 December 2025; President's assent 21 December 2025; replaces MGNREGA. Wages weekly, or within 15 days at most; unemployment allowance if no work within 15 days; States may notify up to 60 days a year of pause in peak farm seasons; administrative ceiling raised from 6% to 9%
100 days of guaranteed wage employment to rural households
Key: Enacted September 2005; rolled out in phases between February 2006 and April 2008
Functional household tap connection for every rural home
Key: Launched 15 August 2019; Centrally Sponsored Scheme, extended to 2028. Upkeep of its water-supply assets is now a permissible work
Organise rural poor women into Self-Help Groups and federations
Key: Launched June 2011 by the Ministry of Rural Development, restructuring SGSY. SHG worksheds, SHE Marts and federation buildings are now permissible works
Digital access points for government and other services in villages
Key: Introduced in 2006 under the National e-Governance Plan; run by CSC e-Governance Services India Ltd, an SPV of MeitY set up on 16 July 2009
An artificial glacier shaped as a tall cone. Winter stream water is piped downhill and sprayed so it freezes; the cone's small sun-facing surface slows melting, releasing water in late spring. Devised by Sonam Wangchuk in Ladakh in 2013, building on Chewang Norphel's earlier artificial glaciers.
Simple Analogy: A water tank made of ice that opens itself at sowing time.
Gram Sabha means all persons on the electoral rolls of a village within a Panchayat area; it exercises the powers the State Legislature gives it by law. Inserted by the 73rd Amendment Act, 1992, in force 24 April 1993
Plans are prepared locally and spatially integrated with PM GatiShakti; all assets created are aggregated into the Stack, which helps converge Central, State and local spending and avoid duplication
GS Paper 2 > Welfare Schemes for Vulnerable Sections; GS Paper 3 > Inclusive Growth and Employment
General Awareness > Government Schemes > Rural Development
General Awareness > Social Sector Schemes
Viksit Bharat - Guarantee for Rozgar and Ajeevika Mission (Gramin): the 125-day rural work guarantee that replaced MGNREGA
Central funds fixed for each State by formula, replacing open-ended demand-based release
Village-level plan, approved by the Gram Sabha, from which every work must originate
An asset built for one household, such as a livestock shelter or farm pond, rather than for the community