India had 7.43 GW of operational pumped storage capacity across 10 projects as of August 2026, with another 15.87 GW across 11 projects under construction, per a PIB backgrounder drawing on Central Electricity Authority (CEA) data.
CEA has identified 320 pumped storage sites with 345.38 GW potential; off-stream sites (258 projects, 288.71 GW) far outweigh on-stream ones (62 projects, 56.67 GW).
CEA envisages 100.81 GW of new pumped storage by 2035-36, taking cumulative capacity to about 105.56 GW.
India ranks fourth in the world in installed pumped storage (7.18 GW at end-2025, IRENA), after China, Japan and the United States.
On-stream: both reservoirs on a river or stream. Off-stream open-loop: only one reservoir on a watercourse. Off-stream closed-loop: neither reservoir on a perennial river or stream. Off-stream sites are being preferred because they build faster and disturb aquatic ecology less.
Projected pumped storage additions (GW)
| Year | Addition | Cumulative |
|---|---|---|
| Up to 2024-25 | - | 4.745 |
| 2025-26 | 2.68 | 7.425 |
| 2026-27 | 2.92 | 10.345 |
| 2027-28 | 1.6 | 11.945 |
| 2028-29 | 6.35 | 18.295 |
| 2029-30 | 13.5 | 31.795 |
| 2030-31 | 21.19 | 52.985 |
| 2031-32 | 8.8 | 61.785 |
| 2032-33 | 14.59 | 76.375 |
| 2033-34 | 11.88 | 88.255 |
| 2034-35 | 5.7 | 93.955 |
| 2035-36 | 11.6 | 105.555 |
| Total addition | 100.81 | - |
Policy framework for faster PSP development
Key: Site-allotment routes, exemption from free-power and Local Area Development Fund obligations, use of exhausted coal mines for PSPs
Standard procurement of storage capacity and stored energy from PSPs
Key: Transparent bidding framework for discoms and agencies
Improve PSP viability
Key: 100% waiver of inter-state transmission charges for 25 years from commercial operation, for PSPs whose construction is awarded by 30 June 2028
Cut approval time
Key: CEA DPR concurrence cut from 90 to 50 days; inter-state clearance requirement removed; MoEFCC allows B2 categorisation for eligible PSPs
Reduce approvals for hydro schemes
Key: Concurrence needed only above Rs 3,000 crore capex; off-stream closed-loop PSPs exempt at any cost
The battery-side counterpart to PSP support
Key: Rs 3,760 crore; up to 40% of capital cost; original target 4,000 MWh by 2030-31
Statutory technical adviser on power; prepares national electricity and storage plans, concurs DPRs; runs the Jal Vidyut DPR portal. Constituted under Section 70 of the Electricity Act, 2003 (originally set up under the Electricity (Supply) Act, 1948); up to 14 members; attached office of the Ministry of Power
Intergovernmental agency on renewables; publishes global capacity statistics. Founded 2009; statute in force 8 July 2010
GS Paper 3 > Infrastructure > Energy
General Awareness > Economy > Energy
Recently, term the "pumped-storage hydropower" is actually and appropriately discussed in the context of which one of the following?
Answer: Long duration energy storage
Storage that shifts large energy volumes over many hours — pumped storage's strength, while batteries suit fast, short-duration balancing
Neither reservoir sits on a perennial river or stream; exempt from CEA concurrence regardless of cost
Fees for using the inter-state transmission system; waived 100% for 25 years for eligible PSPs