The Indian Navy has begun trials of the Rafale Marine (Rafale M) fighter at the Shore Based Test Facility in Goa to validate the modifications needed for operations from the indigenous carrier INS Vikrant (reported 22 October 2026).
The trials test whether the jet can take off and land safely under Vikrant's STOBAR system: ski-jump take-off and arrested recovery with a tail hook and arrestor wires.
India signed the deal for 26 Rafale M jets (22 single-seat, 4 twin-seat trainers) with France on 28 April 2025, worth about Rs 63,000 crore; deliveries are due from mid-2028 to 2030.
The jets, built by Dassault Aviation, will fly from INS Vikrant and INS Vikramaditya alongside the Navy's MiG-29K fleet.
The jet takes off on its own power up a ski-jump ramp, which gives it extra lift, and lands by catching a deck arrestor wire with its tail hook. Carriers with steam or electromagnetic catapults use CATOBAR instead, which allows heavier take-off loads.
Simple Analogy: A ski-jump to launch, a rope across the runway to stop.
Built INS Vikrant, the largest warship ever constructed in India
Indian Navy's in-house design organisation; designed INS Vikrant
French maker of the Rafale and Rafale M
First INS Vikrant (R11), bought from the UK, decommissioned; the new carrier takes its name
Two French Navy Rafale M jets demonstrate ski-jump take-off and arrested landing at the SBTF, INS Hansa, during the Navy's fighter competition (rival: Boeing F/A-18E Super Hornet)
INS Vikrant commissioned at Kochi
India-France agreement for 26 Rafale M signed
Rafale M trials begin at the SBTF, Goa, for Vikrant operations
Scheduled deliveries of the 26 jets
GS Paper III > Security - Defence technology and indigenisation
General Knowledge > Defence equipment and platforms
Short Take-Off But Arrested Recovery: ski-jump launch, arrestor-wire landing; used on INS Vikrant and INS Vikramaditya
Land-based replica of a carrier deck with ski-jump and arrestor gear at INS Hansa, Goa, used to test carrier aircraft before sea trials
Naval Rafale with reinforced landing gear and tail hook; 26 ordered by India in April 2025