NHPC's proposal to divert about 3,278 hectares of forest land in Arunachal Pradesh for the 1,720 MW Kamala Hydro Electric Project was listed before the Union Environment Ministry's Forest Advisory Committee (FAC) on 23 October 2026.
About 23.4 lakh trees (23,40,213) are earmarked for felling across the Hapoli and Kra Daadi forest divisions in Kamle, Kra Daadi and Kurung Kumey districts.
Compensatory afforestation over 7,018 hectares is proposed on degraded forest land in Madhya Pradesh, because Arunachal could not provide the land.
The Expert Appraisal Committee recommended environmental clearance in January 2026, subject to Stage-I (in-principle) forest clearance; the CCEA approved an investment of Rs 26,069.50 crore in April 2026.
The Kamala rises in the lower Himalaya of central Arunachal Pradesh and joins the Subansiri, the largest tributary of the Brahmaputra. The Subansiri then enters Assam, where NHPC's 2,000 MW Subansiri Lower project sits near the Arunachal-Assam border. The Shillong regional office of the Environment Ministry found that the site lies outside any national park, wildlife sanctuary, biosphere reserve or elephant corridor.
Forest land cannot be put to non-forest use without the Central Government's prior approval. The Forest Advisory Committee, constituted under the Act, examines proposals such as Kamala's and advises the Centre. Approval comes in two stages: Stage-I (in-principle) and Stage-II (final).
Money paid by user agencies for compensatory afforestation and the net present value of the diverted forest goes into the National and State CAMPA funds. Where equivalent non-forest land is not available, plantation is raised on degraded forest land of twice the diverted area, which may lie in another State.
Large hydro projects need prior environmental clearance after appraisal by the Expert Appraisal Committee on river valley and hydroelectric projects. For Kamala, final clearance is tied to in-principle forest clearance.
Navratna hydropower CPSE under the Ministry of Power; developer of Kamala and of the 2,000 MW Subansiri Lower project
Statutory committee of the Union Environment Ministry that examines forest-diversion proposals and recommends Stage-I approval
Appraises hydro projects for environmental clearance; recommended Kamala at its 47th meeting in January 2026
Approved the Rs 26,069.50 crore investment in Kamala (with the 1,200 MW Kalai-II project in Anjaw district) in April 2026
Public Investment Board clears the Kamala project; the Expert Appraisal Committee, at its 47th meeting, recommends environmental clearance subject to in-principle forest clearance.
CCEA approves an investment of Rs 26,069.50 crore with a 96-month completion period, alongside the 1,200 MW Kalai-II project.
Reports detail the forest diversion: 3,278 ha of forest and 23.4 lakh trees, with afforestation in Madhya Pradesh.
The proposal is listed before the Forest Advisory Committee for Stage-I forest clearance.
GS Paper 3 > Environment > Forest conservation, EIA; Infrastructure > Energy (hydropower)
General Awareness > Static GK > Power projects and rivers of India
Consider the following rivers: 1. Barak 2. Lohit 3. Subansiri Which of the above flows/flow through Arunachal Pradesh?
Answer: 2 and 3 only
Which one of the following pairs of States of India indicates the easternmost and westernmost State?
Answer: Arunachal Pradesh and Gujarat
Which one of the following National Parks has a climate that varies from tropical to subtropical, temperate and arctic?
Answer: Namdapha National Park
Consider the following States: 1. Arunachal Pradesh 2. Himachal Pradesh 3. Mizoram In which of the above States do 'Tropical Wet Evergreen Forests' occur?
Answer: 1 and 3 only
In which one of the following States is Pakhui Wildlife Sanctuary located?
Answer: Arunachal Pradesh
In-principle approval for forest diversion, given on conditions such as compensatory afforestation and payment of net present value; final (Stage-II) approval follows once they are met.
Plantation raised to offset forest land diverted for non-forest use, financed through CAMPA funds under the 2016 Act.
Reservoir capacity held back to absorb flood peaks downstream; the Centre funds it separately for Kamala (Rs 4,743.98 crore).