ISRO Chairman V. Narayanan said on 24 October 2026, at a university convocation near Chennai, that India aims to have four functional launch pads by 2029.
Today ISRO launches from two pads at Satish Dhawan Space Centre, Sriharikota. A Third Launch Pad there (approved January 2025, about Rs 3,985 crore) and a 2,000-acre SSLV complex at Kulasekarapattinam, Tamil Nadu, are being built.
He said the first uncrewed Gaganyaan test is due within two months, followed by two more before the crewed flight.
Chandrayaan-5, a joint mission with Japan's JAXA, will carry a 350 kg rover for about 100 days of surface work. ISRO will not be privatised, he added.
Sriharikota is a barrier island in Andhra Pradesh, on the Bay of Bengal coast. Kulasekarapattinam lies on Tamil Nadu's southern coast in Thoothukudi district. From there a rocket can fly due south to polar orbit over open sea, without the 'dogleg' turn that launches from Sriharikota need to avoid flying over Sri Lanka. That turn costs fuel and cuts the payload of a small rocket like the SSLV.
First Launch Pad at Sriharikota hosts its first flight (PSLV-D1)
Second Launch Pad at Sriharikota becomes operational
Foundation stone laid for the SSLV Launch Complex at Kulasekarapattinam
Union Cabinet approves the Third Launch Pad at Sriharikota
Construction begins at Kulasekarapattinam; launch pad foundation laid in August 2025
ISRO Chairman announces target of four functional launch pads by 2029
National space agency under the Department of Space; founded 15 August 1969
ISRO's spaceport, home to its two operational launch pads and the upcoming Third Launch Pad
GS Paper III > Science and Technology > Space
General Awareness > Science and Technology > ISRO
Read the following statements marked as Assertion (A) and Reason (R). Choose the correct option. Assertion (A): India is actively developing a Third Launch Pad (TLP) at the Satish Dhawan Space Centre (SDSC-SHAR). Reason (R): The Third Launch Pad is specifically designed to significantly boost India's space launch frequency and accommodate larger, next-generation launch vehicles like NGLV.
Answer: Both A and R are true, and R is the correct explanation of A
Small Satellite Launch Vehicle: an ISRO rocket with three solid stages that carries up to 500 kg to low Earth orbit and can be readied quickly
A mid-flight change of direction that costs fuel and payload, needed from Sriharikota for polar launches to avoid flying over Sri Lanka
Next Generation Launch Vehicle, ISRO's future heavy rocket; the Third Launch Pad is built mainly for it