B28 is India's first indigenously designed bullet train, designed by the Integral Coach Factory (ICF) and built by BEML in Bengaluru for a design speed of 280 kmph. Railway Minister Ashwini Vaishnaw inspected it on 1 November 2026.
Its first body frame is complete and was under a squeeze test, a structural check that Vaishnaw linked to the pressure a train faces at high speed.
ICF placed the order in October 2024: Rs 866.87 crore for two eight-car trainsets (Rs 27.86 crore per car), with a maximum operating speed of 249 kmph.
Track trials are expected by mid-2027. A faster successor, the B35, with a design speed of 350 kmph, is planned next.
Indian Railways coach production unit; designed the B28 and placed the order
Defence Ministry public sector undertaking; builds the B28 trainsets at Bengaluru
Implementing agency of the Mumbai-Ahmedabad bullet train corridor
General Awareness > Indian Railways, infrastructure
GS Paper III > Infrastructure — railways; indigenisation of technology
ICF-designed, BEML-built 280 kmph high-speed trainset for Indian high-speed corridors
Structural test that loads a carbody shell to check it withstands the forces of operation
Mumbai-Ahmedabad High Speed Rail corridor, about 508 km, built by NHSRCL