TRAI released the Telecommunication Interconnection (Third Amendment) Regulations, 2026 on 3 November 2026; they take effect on 1 January 2027.
All new interconnections must be IP-based, and existing E1/TDM points of interconnection (POIs) must move to IP within three years, in phases.
Traffic handover moves from the LDCA/SDCA level to the Licensed Service Area (LSA) level, with existing traffic to migrate within three years.
Interest on delayed interconnection payments is capped at SBI's one-year MCLR plus 2%, and bank-guarantee reassessment moves from every six months to every twelve.
The rules amend the Telecommunication Interconnection Regulations, 2018 and are issued under Section 11(1)(b) of the TRAI Act, 1997.
Empowers TRAI to fix the terms and conditions of interconnection and ensure technical compatibility between service providers; the source of this amendment
Created the Telecom Disputes Settlement and Appellate Tribunal (TDSAT), taking dispute adjudication away from TRAI
The principal regulations now amended for the third time
Replaced the Indian Telegraph Act, 1885 and the Indian Wireless Telegraphy Act, 1933 as the main telecom law
Statutory telecom and broadcasting regulator, set up on 20 February 1997 under the TRAI Act, 1997
Settles disputes between service providers and hears appeals against TRAI decisions; set up in 2000
Licensor; part of the Ministry of Communications
| Item | Before | After the Third Amendment |
|---|---|---|
| Level of traffic handover | LDCA / SDCA-level POIs | LSA-level POIs (migration within 3 years) |
| Technology | E1 / TDM-based POIs | IP-based for all new links; existing ones migrate within 3 years |
| Giving up a POI | Only 'disconnection' | Disconnection plus voluntary 'surrender' |
| Bank-guarantee reassessment | Every 6 months | Every 12 months |
| Interest on late payment | No specific provision | Mutually agreed, capped at SBI 1-year MCLR + 2% |
| Penalties | No graded scale | Graded financial disincentives |
Pre-Consultation Paper on reviewing TRAI's interconnection regulations
Consultation Paper issued
Extended last dates for comments and counter-comments (17 stakeholders commented, 9 sent counter-comments)
Open House Discussion held
Third Amendment Regulations released
Regulations come into force; three-year migration clocks start
GS Paper II > Statutory and regulatory bodies; GS Paper III > Infrastructure — telecom
General Awareness > Polity and economy — regulators
General Awareness > Regulators and benchmark rates (MCLR)
The technical, operational and commercial arrangements that let traffic pass between two operators' networks
The place where one operator's network hands traffic to another's
The telecom circle a licence covers, broader than the old LDCA/SDCA charging areas
Time-division circuit switching on E1 links versus packet-based Internet Protocol links, which use bandwidth more efficiently