The Union Cabinet has approved the construction of two significant hydro-electric projects in Arunachal Pradesh.
The approved projects are the Kamala Hydro Electric Project and the Kalai-II Hydro-electric Project.
The total financial outlay for these projects is estimated to exceed ₹40,000 crore.
These projects aim to boost India's renewable energy capacity and contribute to regional development.
Hydro-power is a key component of India's renewable energy mix, contributing to climate change mitigation and reducing reliance on fossil fuels.
These projects are part of broader efforts to develop infrastructure and promote economic growth in India's North-Eastern states, which are strategically significant.
Large government outlays on infrastructure projects stimulate economic activity, create jobs, and enhance national capabilities.
Hydro-electric projects involve dam construction and reservoir management, impacting water availability for irrigation, flood control, and other uses.
Hydro-electric power is a form of renewable energy that harnesses the kinetic energy of flowing or falling water to generate electricity. Typically, dams are built to create reservoirs, and water is released through turbines, which then drive generators to produce electricity. It is a clean energy source but can have significant environmental and social impacts during construction.
Simple Analogy: Imagine a giant water wheel (turbine) being spun by a powerful waterfall (dammed river), and this spinning wheel then powers a generator to light up homes.
GS Paper I (Geography - Physical Geography, Resources), GS Paper III (Economy - Infrastructure, Energy; Environment - Conservation, Environmental Impact Assessment; Security - Border Area Development, North-East).
General Awareness (Indian Geography, Economy, Government Schemes, Major Projects).
General Awareness (Economy, Government Initiatives, Infrastructure Financing).
General Awareness (Indian Geography, Major Projects, Economy).
General Awareness (Indian Geography, Strategic Infrastructure, Border Area Development).
Consider the following States: 1. Andhra Pradesh 2. Kerala 3. Himachal Pradesh 4. Tripura How many of the above are generally known as tea-producing States?
Answer: All four States
Consider the following pairs: Port : Well known as 1. Kamarajar Port : First major port in India registered as a company 2. Mundra Port : Largest privately owned port in India 3. Visakhapatnam Port : Largest container port in India How many of the above pairs are correctly matched?
Answer: Only two pairs
With reference to India's projects on connectivity, consider the following statements: 1. East-West Corridor under Golden Quadrilateral Project connects Dibrugarh and Surat. 2. Trilateral Highway connects Moreh in Manipur and Chiang Mai in Thailand via Myanmar. 3. Bangladesh-China-India-Myanmar Economic Corridor connects Varanasi in Uttar Pradesh with Kunming in China. How many of the above statements are correct?
Answer: None
Medium-High for infrastructure and energy-related current affairs, particularly those involving significant government investment or strategic locations.
Electricity generated from the energy of moving water.
Energy derived from natural processes that are replenished constantly.
Construction and improvement of basic facilities and systems needed for the operation of a society or enterprise.