Jal Jeevan Mission: rural tap connections rose from 3.23 crore (16.72%) in 2019 to over 15.86 crore (81.94%) by June 2026; JJM 2.0 extends the mission to December 2028 with a Rs 8.69 lakh crore outlay (Rs 3.59 lakh crore central).
Ujjwala has delivered over 10.57 crore LPG connections; national LPG coverage rose from 55.9% (April 2014) to 107.2% (April 2026).
PMAY-G has completed 3.05 crore of 3.91 crore sanctioned houses; PMAY-U has completed over 98 lakh of 1.25 crore sanctioned.
Installed power capacity grew from 248 GW (FY14) to over 532 GW (March 2026); peak demand hit a record 256.1 GW on 25 April 2026.
UDAN has operationalised 665 routes; India's airports rose from 74 in 2014 to 165 by April 2026.
Launched 15 August 2019 under the Ministry of Jal Shakti (Department of Drinking Water and Sanitation) to give every rural household a functional tap connection, at 55 litres per person per day
Key: 12 crore connections added in six years with Rs 2.08 lakh crore; 1.81 lakh villages certified Har Ghar Jal by Gram Sabhas; 11 States/UTs fully covered; 2,843 labs tested 38.78 lakh samples in FY26; 24.80 lakh women trained on field test kits. JJM 2.0 (Cabinet, March 2026) runs to December 2028 and shifts focus from building infrastructure to delivering the service.
Ministry of Petroleum & Natural Gas scheme launched 1 May 2016 at Ballia, Uttar Pradesh, giving LPG connections to women of poor households
Key: 8 crore target met September 2019; Ujjwala 2.0 (August 2021) added 1 crore by January 2022, then 60 lakh (1.60 crore by December 2022), 75 lakh (July 2024) and 25 lakh more approved for FY 2025-26. LPG consumers 14.51 crore (2014) to 33.39 crore (2026).
Ministry of Rural Development rural housing scheme launched 20 November 2016 at Agra; restructured the Indira Awaas Yojana (1985)
Key: Rs 1.20 lakh per house in plains and Rs 1.30 lakh in hilly/difficult areas; 3.98 crore target, 3.91 crore sanctioned, 3.05 crore completed; 75% of sanctioned houses owned by women or held jointly.
Ministry of Housing and Urban Affairs scheme (2015) for EWS, LIG and MIG families; PMAY-U 2.0 approved by the Cabinet on 9 August 2024 for 1 crore more urban families with Rs 2.30 lakh crore of central assistance
Key: Up to Rs 2.5 lakh under the Beneficiary-Led Construction (BLC) vertical; a woman must be owner or co-owner. 1.25 crore sanctioned, 98 lakh+ completed, against 8 lakh urban houses in 2005-14.
Atal Mission for Rejuvenation and Urban Transformation, launched 25 June 2015 in 500 cities (water, sewerage, green spaces, transport); AMRUT 2.0 launched 1 October 2021 for FY22-FY26 with the aim of water-secure cities
Key: AMRUT 2.0 covers all 4,800 statutory towns with a Rs 2.99 lakh crore outlay, nearly three times AMRUT; Rs 2.79 lakh crore of projects sanctioned, against Rs 62,983 crore under JnNURM before 2015.
Mission launched 2 October 2014; Phase II approved February 2020 for 2020-21 to 2024-25 with a Rs 1,40,881 crore outlay under the Department of Drinking Water and Sanitation
Key: Moves villages from ODF to ODF Plus — sustaining ODF status plus solid and liquid waste management (5.34 lakh villages with solid, 5.55 lakh with liquid waste arrangements).
Ministry of Power scheme launched 25 September 2017, with REC as nodal agency, for free last-mile electricity connections to unelectrified homes
Key: About 2.86 crore households connected by March 2022, when the scheme closed with its targets met.
Regional Connectivity Scheme launched 21 October 2016 under the National Civil Aviation Policy 2016; Ministry of Civil Aviation, with the Airports Authority of India as implementing agency; first flight Shimla-Delhi on 27 April 2017
Key: Viability Gap Funding for airlines; 665 routes over 95 airports, heliports and water aerodromes; 1.64 crore passengers on 3.45 lakh flights. The Modified UDAN Scheme (March 2026) targets 120 new destinations and 4 crore more passengers.
Rooftop solar scheme launched February 2024 — up to 300 free units a month, with a subsidy of up to Rs 78,000
Key: Over 40 lakh homes covered by May 2026; target of 1 crore homes by FY 2026-27; outlay Rs 75,021 crore.
| Aspect | SBM-Grameen | JJM | AMRUT 2.0 |
|---|---|---|---|
| Ministry | Jal Shakti (DDWS) | Jal Shakti (DDWS) | Housing and Urban Affairs |
| Launched | 2 Oct 2014 (Phase II: 2020-25) | 15 Aug 2019 (2.0 to Dec 2028) | 1 Oct 2021 (AMRUT: 25 June 2015) |
| Area | Rural sanitation | Rural drinking water | Urban water and sewerage |
| Headline goal | ODF to ODF Plus | Har Ghar Jal | Water-secure cities, all statutory towns |
Jan Dhan-Aadhaar-Mobile; PMJDY (announced August 2014) is the first pillar and carries DBT; 40.60 crore RuPay cards issued with accident cover.
Mumbai-Ahmedabad (508 km, 320 kmph); Surat-Bilimora section to open in 2027; seven more corridors were announced in Budget 2026-27, including Delhi-Varanasi and Varanasi-Siliguri.
Launched 2023; 1,338 stations to be redeveloped (157 in Aspirational Districts); 208 upgraded by 1 April 2026.
Atal Tunnel (2020, Manali-Lahaul Spiti), Sudarshan Setu (2024, Okha-Beyt Dwarka), Maitri Setu (2021, Tripura-Bangladesh), Dhola Sadiya Bridge (2017, Assam-Arunachal), Z-Morh/Sonamarg Tunnel (2025).
'Golden Decade of Infrastructure Development in India' (January 2026) found metro access improves household loan repayment.
GS Paper 2 > Governance > Welfare Schemes; GS Paper 3 > Infrastructure (Energy, Roads, Railways, Airports)
General Awareness > Government Schemes
General Awareness > Financial Inclusion (PMJDY, MUDRA)
In which year was the "Pradhan Mantri Ujjwala Yojana" (PMUY) launched?
Answer: 2016
Consider the following statements about 'PM Surya Ghar Muft Bijli Yojana': I. Targets 1 crore homes... II. Training on installation... III. Create 3 lakh skilled manpower... Which of the statements given above are correct?
Answer: I, II and III
The "Pradhan Mantri Jan Dhan Yojana" (PMJDY) was launched in which year?
Answer: 2014
The "Pradhan Mantri Jan Dhan Yojana" (PMJDY) was launched in which year?
Answer: 2014
Which of the following statements about the 'Pradhan Mantri Jan Dhan Yojana (PMJDY)' is correct? It was launched in 2014 to promote financial inclusion. It provides an overdraft facility of up to ₹10,000 to eligible account holders.
Answer: Both 1 and 2
Scheme-ministry-launch-year pairings appear in UPSC and SSC papers most years.
A village that sustains ODF status and manages solid and liquid waste — SBM-G Phase II goal.
A Gram Sabha certifies that every household has a functional tap connection.
Subsidy to airlines under UDAN to keep regional fares affordable.
PMAY-U 2.0 vertical giving up to Rs 2.5 lakh to build on one's own land.