Under the Coal Logistics Plan and Policy 2030, 72 of 139 First Mile Connectivity (FMC) projects are commissioned, giving about 589 MTPA of the planned 1,319 MTPA. The rest are due by FY 2029-30, and rail's share of coal transport is to reach 75%.
Of 132 commercial coal blocks allocated since the auctions opened in June 2020, 15 are producing. Development timelines under the CBDPA have been cut from 51 to 40 months for fully explored blocks.
Thermal power plants held 42.8 MT of coal on 12 July 2026, enough for 14 days at 85% PLF. Coal and lignite plants (230.8 GW) supplied 69.54% of electricity in April-June 2026.
Deliver coal more cheaply by shifting it off roads. Launched in February 2024 by the Ministry of Coal with the Ministries of Railways, Power and Road Transport & Ports
Key: Rail share of coal movement to rise to 75% by FY2030, from about 64%. Promotes coastal shipping, inland waterways and Rail-Sea-Rail (RSR); CIL cut the Performance Incentive on RSR supplies beyond ACQ from 40% to 20%
Open coal to any bidder, with no end-use restriction. PM launched the first auction of 41 blocks on 18 June 2020 under Aatmanirbhar Bharat
Key: Revenue sharing is pegged to the National Coal Index. 100% FDI is allowed through the automatic route. A 50% rebate on the final offer applies to coal produced ahead of schedule and to coal that is gasified or liquefied
The price index on which commercial-mining revenue share is calculated
Key: Rolled out on 4 June 2020 and developed by the Indian Statistical Institute, Kolkata. It combines notified, auction and import prices, with FY 2017-18 as the base year
Coal linkages for the power sector
Key: Imported-coal-based plants can now obtain domestic coal, and existing Fuel Supply Agreement holders can buy beyond 100% of their Annual Contracted Quantity (ACQ). ACQ was restored to 100% of normative need, from 90% for non-coastal and 70% for coastal plants
Coal Linkage for Seamless, Efficient & Transparent Utilisation
Key: A new window under the Non-Regulated Sector (NRS) Linkage Auction Policy, 2016, for any industrial use or export. NRS coking-coal linkages now run for up to 30 years, and a 'Steel using Coking coal through WDO route' sub-sector was added in March 2024. Coking Coal Mission: to raise domestic coking coal supply to steel
Captive mine owners, except for atomic minerals, may sell up to 50% of annual output, coal included, in the open market after meeting the needs of the linked end-use plant
Coking coal was notified as a Critical and Strategic Mineral on 29 January 2026 under Section 11C, on the advice of the High-Level Committee on Viksit Bharat Goals and NITI Aayog
Notified 30 January 2023. Every coal unit must be able to run down to a 40% minimum technical level, so the grid can absorb solar and wind
Land compensation follows Schedule I of RFCTLARR (or a mutual agreement under Section 14(1) of the CBA Act). R&R follows Schedule II and resettlement amenities Schedule III. An R&R committee headed by the District Collector oversees it
Maharatna PSU under the Ministry of Coal, incorporated 1 November 1975 after coal nationalisation. It is bringing continuous miners, longwall and highwall mining to its underground mines
Coal miner owned 51% by the Government of Telangana and 49% by the Centre; founded 23 December 1920
Statutory technical adviser under Section 70 of the Electricity Act, 2003. It approves deferral of thermal-unit maintenance in peak months and framed the 2023 flexible-operation rules
GS Paper 3 > Indian Economy > Infrastructure: Energy, Mining, Railways
General Awareness > Economy > Energy and Mining
Mechanised pithead-to-loading-point coal transport by conveyor, silo and rapid loading system, replacing trucks
Actual generation divided by the maximum possible generation of a plant over a period
Annual Contracted Quantity: the coal a linkage holder is entitled to under its Fuel Supply Agreement