11 Pumped Storage Projects totalling 15,870 MW are under construction, and 6 more totalling 8,140 MW have been concurred or appraised by the CEA but not yet started (Rajya Sabha reply, 20 July 2026).
CEA's revised guidelines cut DPR concurrence time for all PSPs from 90 to 50 days and drop the inter-state aspects clearance; off-stream closed-loop PSPs need no CEA concurrence at all.
CERC waives 100% of ISTS charges for 25 years from COD for PSPs whose construction is awarded by 30 June 2028.
Pumped Storage Projects: under construction, and concurred but not yet taken up
| Project (executing agency) | State | MW | Target / concurrence |
|---|---|---|---|
| Under construction (Table I) — 15,870 MW | |||
| Upper Sileru (APGENCO) | Andhra Pradesh | 1,350 | Feb 2029 |
| Sharavathy (KPCL) | Karnataka | 2,000 | May 2032 |
| Kundah Ph I-III (TANGEDCO) | Tamil Nadu | 500 | Feb 2027 |
| Gandhi Sagar (Greenko) | Madhya Pradesh | 1,920 | Dec 2026 |
| Chitravathi (Adani) | Andhra Pradesh | 500 | Feb 2027 |
| Bhivpuri (Tata Power) | Maharashtra | 1,000 | Feb 2029 |
| Saundatti (Greenko) | Karnataka | 1,600 | Dec 2027 |
| Bhavali (JSW Energy) | Maharashtra | 1,500 | Dec 2028 |
| Gandikota (Adani) | Andhra Pradesh | 1,000 | Mar 2029 |
| Tarali (Adani) | Maharashtra | 1,500 | Jun 2029 |
| Saidongar-1 Karjat (Torrent) | Maharashtra | 3,000 | Dec 2029 |
| Concurred/appraised by CEA, not yet started (Table II) — 8,140 MW | |||
| Chichlik (Avaada), appraised | Uttar Pradesh | 1,560 | 08.07.2026 |
| Pane (JSW Neo Energy) | Maharashtra | 1,500 | 09.10.2025 |
| Shirawta (Tata Power) | Maharashtra | 1,800 | 01.09.2025 |
| Kandhaura (JSW Energy) | Uttar Pradesh | 1,680 | 13.06.2025 |
| Upper Indravati (OHPC) | Odisha | 600 | 19.08.2024 |
| Turga (WBSEDCL) | West Bengal | 1,000 | 05.10.2016 |
Surplus off-peak power pumps water to an upper reservoir, and the water is released through turbines at peak demand. A closed-loop off-stream PSP places both reservoirs away from any flowing river. PSPs provide long-duration storage, frequency regulation, voltage support and black start.
Statutory technical adviser to the Ministry of Power; concurs hydro/PSP DPRs. Set up in 1951 under the Electricity (Supply) Act, 1948, made full-time in 1975, and now constituted under Section 70 of the Electricity Act, 2003
Central power regulator, first constituted on 24 July 1998 under the Electricity Regulatory Commissions Act, 1998; now under Section 76 of the Electricity Act, 2003. Granted the ISTS waiver for PSPs by notification of 26 June 2025
PSPs may now be appraised as B2 under conditions. B2 projects need no EIA report or public hearing and are cleared at state level (SEIAA).
Baseline data for one non-monsoon season for closed-loop PSPs, and for two seasons (pre- and post-monsoon) for open-loop PSPs.
Survey provisions for mining extended to hydel/PSPs, and more boreholes allowed for exploration.
Set storage purchase of 1% in 2023-24 rising to 4% by 2029-30, with at least 85% of stored energy from renewables; the October 2023 notification under the Energy Conservation Act dropped the separate storage obligation.
GS Paper 3 > Infrastructure > Energy; Renewable Energy Integration
General Awareness > Economy > Power Sector
Restarting a power station, and hence the grid, after a total blackout without drawing grid power
Inter-State Transmission System; its charges are waived 100% for 25 years for eligible PSPs
EIA 2006 class exempt from an EIA report and public hearing, appraised by SEIAA