Larsen & Toubro (L&T) won a 'significant' order (Rs 1,000-2,500 crore band) from Noida Metro Rail Corporation (NMRC), disclosed on 9 November 2026.
It covers part design and construction of a 15.1 km elevated viaduct and 10 elevated stations on two Aqua Line extensions: Botanical Garden–Sector 142 and Depot–Boraki.
The work is to be finished in 36 months; Botanical Garden will link the Aqua Line with the Delhi Metro's Blue and Magenta lines.
Builds and owns the Noida–Greater Noida Aqua Line
Engineering and construction conglomerate; its Heavy Civil Infrastructure arm won the order
The extensions run inside Gautam Buddh Nagar district, Uttar Pradesh. Botanical Garden (Noida Sector 38) links to Delhi's network, and Boraki in Greater Noida links to the planned multi-modal hub.
General Awareness > Infrastructure / Business
A raised concrete deck on piers that carries metro tracks above road level