CCEA approved the 3rd and 4th line of the Ballari-Guntakal railway section.
The project covers Karnataka and Andhra Pradesh, adding 46 Kms to the network.
The total estimated cost is Rs 1,264 crore, scheduled for completion by 2028-29.
GS Paper 3 > Infrastructure > Railways
Consider the following: 1. Areca nut 2. Barley 3. Coffee 4. Finger millet 5. Groundnut 6. Sesamum 7. Turmeric The Cabinet Committee on Economic Affairs has announced the Minimum Support Price for which of the above?
Answer: 2, 4, 5 and 6 only
According to the Indian Railways (2019-2020), which state has the largest railway track in India?
Answer: Uttar Pradesh
With reference to bio-toilets used by the Indian Railways, consider the following statements: 1. The decomposition of human waste in the bio-toilets is initiated by a fungal inoculum. 2. Ammonia and water vapour are the only end products in this decomposition which are released into the atmosphere. Which of the statements given above is/are correct?
Answer: Neither 1 nor 2
A National Master Plan for multi-modal connectivity aiming to bring coordination in infrastructure planning.