VB-G RAM G replaced MGNREGA on 1 July 2026: 125 days of work, a ₹300 wage floor, 60:40 funding and 375 permissible works, with the full wage table.
The Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin) Act, 2025 — short form VB-G RAM G — is the law that replaced India's twenty-year-old rural job guarantee, MGNREGA. It came into force in rural areas across the country on 1 July 2026, and MGNREGA was repealed the same day.
The headline change is the guarantee: every rural household whose adult members volunteer for unskilled manual work is now entitled to at least 125 days of wage employment in a financial year, up from 100. The bigger change is in how it is paid for. MGNREGA was demand-driven and the Centre paid the whole unskilled wage bill. VB-G RAM G is a Centrally Sponsored Scheme: the Centre fixes a normative allocation for each State every year, wages and materials are shared 60:40 (90:10 in the North-East and the Himalayan States), and any spending above the allocation falls on the State.
The Act also lets States pause works for up to 60 days a year in peak sowing and harvest, ties every work to a Viksit Gram Panchayat Plan linked to PM Gati Shakti, and groups works into four pillars: water security, core rural infrastructure, livelihood infrastructure, and works against extreme weather.
Bill No. 197 of 2025 introduced in the Lok Sabha by Shivraj Singh Chouhan. Opposition parties object to dropping Mahatma Gandhi's name and demand scrutiny by a parliamentary committee.
Lok Sabha passes the Bill amid protests. The Rajya Sabha takes it up the same evening and passes it by voice vote shortly after midnight, after the opposition walks out over its demand for a select committee.
President Droupadi Murmu gives assent; it becomes the VB-G RAM G Act, 2025 (No. 36 of 2025).
An SBI report (Chief Economic Adviser Soumya Kanti Ghosh) estimates most States will be net gainers of about ₹17,000 crore against the average of the last seven years.
Union Budget 2026-27 gives VB-G RAM G ₹95,692 crore and MGNREGS ₹30,000 crore for the months before the switch.
Centre notifies 1 July 2026 as the date the Act comes into force.
Draft rules published, including the Objective Parameters for Normative Allocation Rules, 2026, which tie State allocations to the Sixteenth Finance Commission's devolution formula.
Ministry deploys 100+ Area Officers to help States with the rollout; interim central share of ₹95,692 crore approved.
Interim list of 318 permissible works shared with States (24 June). A meeting of 18 ministries chaired by Rural Development Secretary Rohit Kansal finalises the Draft Convergence Framework (25 June).
State-wise wage rates notified under Section 10 (Gazette S.O. 3518(E)), effective 1 July: no rate below ₹300.
Act in force nationwide; MGNREGA repealed. Three sets of rules notified: transitional provisions, payment of wages and unemployment allowance, and spending beyond the normative allocation.
National launch at Mukkavaripalle village, Obulavaripalle mandal, Tirupati district (Andhra Pradesh): Gramin Rozgar Guarantee Cards distributed and the VB-G RAM G portal launched.
First instalment ('Mother Sanction') of ₹25,863 crore released to States by video conference from Bhopal.
Dashboard shows 7.67 crore person-days in July 2026 against 15.33 crore in July 2025 (−49.94%); the Ministry says about 9 crore were generated.
Department of Drinking Water and Sanitation asks States to converge Jal Jeevan Mission 2.0 and Swachh Bharat Mission (Grameen) 2.0 works with VB-G RAM G.
1,338 district-level Panch Sammelans held to orient more than 5.26 lakh Panchayati Raj representatives on the Act.
People's Plan Campaign 2026-27 begins with 2.42 lakh+ Special Gram Sabhas; panchayats start plans for 2027-28.
Schedule of Permissible Works notified: 375 works in four pillars, 41% more than MGNREGA's 266.
The Act has seven chapters and two Schedules. Schedule I sets the minimum features every State Scheme must have: works, planning, convergence and transparency. Schedule II sets the conditions and the minimum entitlements of workers.
| Section | Subject | What it provides |
|---|---|---|
| 1(2) | Commencement | In force on a date the Centre notifies; different dates may be set for different States or areas |
| 3 | State Scheme | Each State notifies a Scheme consistent with the Act within six months of commencement; it runs as a Centrally Sponsored Scheme |
| 4(1)-(3) | Planning | All works must come from Viksit Gram Panchayat Plans, aggregated at Block, District and State levels into the Viksit Bharat National Rural Infrastructure Stack, and integrated with the PM Gati Shakti National Master Plan |
| 4(2) | Four domains | Water security; core rural infrastructure; livelihood-related infrastructure; mitigation of extreme weather events |
| 4(4) | Panchayat categories | Gram Panchayats are classed as Category A, B and C on development parameters, including how close they are to urban areas |
| 4(5)-(6) | Normative allocation | The Centre fixes a State-wise normative allocation every year on objective parameters; spending above it is borne by the State |
| 5(1) | The guarantee | At least 125 days of guaranteed employment per household per financial year, in rural areas notified by the Centre |
| 5(3) | Wage payment | Wages paid weekly, and in any case not later than a fortnight after the work |
| 5(4) | Extra days | The Centre or a State may provide work beyond the guaranteed days from its own resources |
| 6 | Farm-season pause | States notify in advance up to 60 days a year, covering peak sowing and harvesting, when no works run; notifications can differ by district, block or panchayat |
| 7 | Calamities | On a State's request the Centre may relax norms in disasters: more permissible works, easier documents or more days of work |
| 10 | Wage rate | Notified by the Centre, may differ by area, and may not be lower than the MGNREGA rate under its Section 6 |
| 11 | Unemployment allowance | Payable by the State if work is not given within 15 days of application: at least one-fourth of the wage for the first 30 days and at least one-half after that |
| 12 | Central Council | Central Gramin Rozgar Guarantee Council: Chairperson, Centre and State representatives, up to 15 non-official members, and a Member-Secretary of at least Joint Secretary rank |
| 13 | State Council | State Gramin Rozgar Guarantee Council: at least one-third of non-official members women, and at least one-third SC, ST, OBC or minorities |
| 14 | National Level Steering Committee | Recommends normative allocations to States, advises on convergence and reviews States' performance |
| 15 | State Level Steering Committee | Chaired by the Chief Secretary (or an officer of at least Additional Chief Secretary rank); approves the aggregated State plan |
| 16 | Panchayats | Panchayats at district, intermediate and village level are the principal authorities for planning, implementation and monitoring |
| 17-18 | Officers | District Collector (or equivalent) is the District Programme Coordinator; a Programme Officer of at least Block Development Officer rank at each Block |
| 19 | Gram Panchayat | Registers households, issues Gramin Rozgar Guarantee Cards and prepares the plan; at least 50% of works by cost go through Gram Panchayats |
| 20 | Social audit | The Gram Sabha monitors works and conducts regular social audits; all records must be made available to it |
| 22 | Funding pattern | 60:40 for States and UTs with legislature; 90:10 for North-Eastern States, Uttarakhand, Himachal Pradesh and Jammu and Kashmir; 100% Centre for UTs without legislature. States alone pay unemployment allowance and delay compensation |
| 24 | Technology | Biometric authentication, GPS or mobile worksite monitoring, real-time dashboards and weekly public disclosure |
| 25 | Grievances | Time-bound, multi-tier grievance redressal at Block and District level |
| 26 | Audit | Audit arrangements prescribed by the Centre in consultation with the Comptroller and Auditor General |
| 27 | Penalty | Contravening the Act: penalty up to ₹10,000 |
| 36 | Removing difficulties | The Centre may issue orders to remove difficulties for three years from commencement |
| 37 | Repeal | MGNREGA, 2005 and its rules, schemes and guidelines are repealed; pending work, liabilities, audits and cases carry over |
| Point | MGNREGA, 2005 | VB-G RAM G Act, 2025 |
|---|---|---|
| Act number | 42 of 2005 | 36 of 2025 |
| In force | 2 Feb 2006 in 200 districts; all rural districts from 1 Apr 2008 | 1 Jul 2026, all rural areas at once |
| Days guaranteed | 100 per household per year | 125 per household per year |
| Nature of funding | Demand-driven: central funds followed the work demanded | Centrally Sponsored Scheme on a fixed State-wise normative allocation |
| Who pays wages | Centre: 100% of unskilled wages | Shared 60:40 (90:10 NE and Himalayan States) |
| Material cost | Centre 75%, State 25% | Shared 60:40 (90:10); material capped at 40% of cost at district level |
| Spending above the budget | Met by the Centre as demand rose | Borne entirely by the State |
| Farm-season pause | None | Up to 60 days a year, notified by the State |
| Wage rate | Notified by the Centre under Section 6, linked to CPI-AL; lowest State rate ₹241 | Notified by the Centre under Section 10; floor of ₹300; cannot be below the MGNREGA rate |
| Wage payment | Weekly, at most a fortnight | Same (Section 5(3)); delay compensation 0.05% of unpaid wages per day |
| Permissible works | 266 | 375, in four pillars |
| Administrative expenses ceiling | 6% | 9% |
| Planning | Gram Panchayats identify projects in their area | Viksit Gram Panchayat Plan, linked to PM Gati Shakti and the National Rural Infrastructure Stack |
| Worker's card | Job card | Gramin Rozgar Guarantee Card, valid three years; a Special card for vulnerable groups |
| Apex body | Central Employment Guarantee Council | Central Gramin Rozgar Guarantee Council plus a National Level Steering Committee |
| Social audit | Gram Sabha (Section 17) | Gram Sabha (Section 20); at least once every six months |
| Named after | Mahatma Gandhi (renamed from 2 Oct 2009) | Viksit Bharat @2047 |
What did NOT change
The Centre notified the first wage rates under the new Act on 30 June 2026 (Gazette S.O. 3518(E), under Section 10), effective 1 July 2026. They replace the MGNREGA rates notified under S.O. 463(E) of 26 February 2013.
For the first time there is an interim base wage of ₹300 a day: no notified rate in the country is lower. The previous lowest rate under MGNREGA was ₹241. 21 States, UTs and administrative units were raised to ₹300, and the national average rose from ₹298.8 to ₹327.4 (over 10%). The Ministry said Uttar Pradesh, Bihar, Jharkhand, West Bengal, Assam, Arunachal Pradesh and Himachal Pradesh saw rises of 15-25%, and reports put the biggest jumps, nearly 24.5%, in Arunachal Pradesh and Nagaland.
| State / UT | Area | Wage (₹/day) |
|---|---|---|
| Andhra Pradesh | All areas | 312 |
| Arunachal Pradesh | All areas | 300 |
| Assam | All areas | 300 |
| Bihar | All areas | 300 |
| Chhattisgarh | All areas | 300 |
| Goa | All areas | 406 |
| Gujarat | All areas | 300 |
| Haryana | All areas | 409 |
| Himachal Pradesh | Non-scheduled areas | 300 |
| Himachal Pradesh | Scheduled areas | 375 |
| Jammu and Kashmir | All areas | 300 |
| Ladakh | All areas | 300 |
| Jharkhand | All areas | 300 |
| Karnataka | All areas | 382 |
| Kerala | All areas | 401 |
| Madhya Pradesh | All areas | 300 |
| Maharashtra | All areas | 317 |
| Manipur | All areas | 300 |
| Meghalaya | All areas | 300 |
| Mizoram | All areas | 300 |
| Nagaland | All areas | 300 |
| Odisha | All areas | 300 |
| Punjab | All areas | 360 |
| Rajasthan | All areas | 300 |
| Sikkim | General | 300 |
| Sikkim | Gnathang, Lachung and Lachen Gram Panchayats | 450 |
| Tamil Nadu | All areas | 345 |
| Telangana | All areas | 308 |
| Tripura | All areas | 300 |
| Uttar Pradesh | All areas | 300 |
| Uttarakhand | All areas | 300 |
| West Bengal | All areas | 300 |
| Andaman and Nicobar Islands | Andaman district | 348 |
| Andaman and Nicobar Islands | Nicobar district | 367 |
| Dadra and Nagar Haveli and Daman and Diu | All areas | 340 |
| Lakshadweep | All areas | 348 |
| Puducherry | All areas | 347 |
| Category | Centre : State | Covers |
|---|---|---|
| North-Eastern States | 90 : 10 | Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim, Tripura |
| Himalayan States and UT | 90 : 10 | Uttarakhand, Himachal Pradesh, Jammu and Kashmir (named in the Act) |
| UTs without legislature | 100 : 0 | Ladakh, Andaman and Nicobar Islands, Lakshadweep, Dadra and Nagar Haveli and Daman and Diu |
| All other States and UTs with legislature | 60 : 40 | Includes Puducherry |
Under MGNREGA, money followed demand: if more people asked for work, the Centre had to find more money. Under VB-G RAM G the Centre fixes each State's normative allocation in advance (Sections 4(5) and 22(4)), on the recommendation of the National Level Steering Committee. If a State spends more, it pays the difference.
The draft Objective Parameters for Normative Allocation Rules, 2026 (May 2026) propose using the Sixteenth Finance Commission's formula for sharing taxes among States, and, from the year after the first year of the Act, tying part of the allocation to performance: paying wages on time, completing social audits and finishing works within the year. The transitional rules of 1 July 2026 allow interim allocations until the final rules are made.
| Criterion | Weight (%) |
|---|---|
| Income distance (per capita GSDP) | 42.5 |
| Population (2011 Census) | 17.5 |
| Area | 10 |
| Forest | 10 |
| Demographic performance | 10 |
| Contribution to GDP | 10 |
| Item | 2024-25 Actuals | 2025-26 RE | 2026-27 BE |
|---|---|---|---|
| MGNREGS | 85,834 | 88,000 | 30,000 |
| VB-G RAM G (central share) | — | — | 95,692 |
The Act puts all works into four thematic domains (Section 4(2) and Schedule I). The Ministry first circulated an interim list of 318 works on 24 June 2026, so the scheme could start on 1 July, and then notified the full Schedule of Permissible Works with 375 works (PIB release, 6 October 2026), 41% more than the 266 allowed under MGNREGA.
| Pillar | Interim list (24 Jun 2026) | Final schedule (Oct 2026) | Examples named by the Ministry |
|---|---|---|---|
| Water Security | 107 | 128 | Check dams, gully plugs, underground dykes, recharge shafts, injection wells, river and nallah rejuvenation, drip and sprinkler systems, rooftop rainwater harvesting, tankas, ice stupas and artificial glaciers |
| Core Rural Infrastructure | 90 | 111 | Solar street lights, waste-to-wealth plants, greywater treatment, rural libraries, veterinary and health centres, Common Service Centres, youth centres, school classrooms and labs, repair of Jal Jeevan Mission water-supply assets |
| Livelihood-related Infrastructure | 86 | 98 | Agro-processing and packaging units, cold storage, mini flour mills, market yards, dairy and mushroom sheds, sericulture sheds, poly-houses, aquaculture, SHG worksheds, SHE Marts, skill centres |
| Extreme Weather Events and Disaster Preparedness | 35 | 38 | Flood relief shelters, retaining walls, embankment strengthening, post-disaster road restoration, forest fire lines and fuel-buffer zones |
| Total | 318 | 375 |
Who gets individual assets first (Schedule I)
Works on private land or homesteads go first to households of: Scheduled Castes; Scheduled Tribes; nomadic tribes; denotified tribes; economically weaker sections; women-headed households; households headed by persons with disabilities; land-reform beneficiaries; PMAY-G beneficiaries; and Forest Rights Act, 2006 beneficiaries. Small and marginal farmers come after these groups.
Grievances
Complaints get a dated acknowledgement and an enquiry within seven working days, and must be resolved within 15 days. Anything unresolved after 15 days is escalated automatically to the next level. Appeals go from Gram Panchayat to Programme Officer to District Programme Coordinator to a State authority, filed within 45 days and decided within 30. Every district has an Ombudsperson.
Viksit Gram Panchayat Plan (VGPP)
Section 4(3), Section 19
Every work must come from it. The Gram Panchayat prepares it with GIS tools and PM Gati Shakti layers, and the Gram Sabha approves it. Plans are aggregated at the Block, District and State levels and approved by the State Level Steering Committee.
Viksit Bharat National Rural Infrastructure Stack
Section 2(v), Schedule I
A single national register of rural public works. Every asset, whether funded under this Act or any other scheme, must be registered and geo-tagged on it to avoid duplication.
'Single Plan – Multi Funding'
Convergence Framework, 25 Jun 2026
One plan per panchayat, paid for from many schemes. Each scheme keeps its own mandate and money. The draft framework was finalised with 18 ministries and departments.
Yuktdhara
Geospatial planning tool
GIS-based tool used to identify and prioritise works, along with water budgeting and hydrogeological assessment.
JJM 2.0 and SBM-G 2.0 convergence
DDWS advisory, 27 Aug 2026
States told to give water security priority in VGPPs, align them with the Village Action Plans of Jal Jeevan Mission 2.0 and Swachh Bharat Mission (Grameen) 2.0, and put the water-supply department's officer on the State Steering Committee.
Digital checks
Section 24
Biometric and face authentication for attendance, geo-tagged worksites, e-muster rolls, real-time dashboards, weekly disclosure meetings at the panchayat, and the use of AI for planning, audits and spotting fraud.
Panchayats at the centre. The Act makes Panchayats at all three levels the principal authorities (Section 16). To prepare them, 1,338 district-level Panch Sammelans reached more than 5.26 lakh Panchayati Raj representatives and officials by 31 August 2026. The People's Plan Campaign 2026-27, 'Sabki Yojana, Sabka Vikas', launched with 2.42 lakh+ Special Gram Sabhas on 2 October 2026, is where the next year's plans are made.
Figures are the Ministry's as reported on 29 September 2026. The 2026-27 totals include April-June, when MGNREGS was still running.
The first-month dip. The official dashboard showed 7.67 crore person-days in July 2026, against 15.33 crore in July 2025, a fall of 49.94%. Households getting work fell 51.45%, to 68.94 lakh. The Ministry disputed the reading. It said about 9 crore person-days were generated, that over 98% of households demanding work were offered it, and that the changeover was smooth. Other explanations offered were the monsoon deficit, kharif sowing, and the new 60-day farm-season pause.
What MGNREGA's own record showed (PRS, February 2026)
President's assent to the National Rural Employment Guarantee Act, 2005 (Act No. 42 of 2005); published in the Gazette on 7 September 2005.
In force in 200 of the poorest districts; launched by Prime Minister Manmohan Singh at Bandlapalli village, Anantapur district, Andhra Pradesh.
Extended to 130 more districts.
Extended to all rural districts of India.
Renamed the Mahatma Gandhi National Rural Employment Guarantee Act by the NREG (Amendment) Act, 2009.
MGNREGA Audit of Schemes Rules, 2011 lay down social audits. They still apply under VB-G RAM G until new social-audit rules are made.
COVID-19: spending rose 55% as migrants returned to villages.
Repealed by Section 37 of the VB-G RAM G Act, 2025.
Must remember
Traps examiners can set
Viksit Bharat – Guarantee for Rozgar and Ajeevika Mission (Gramin). It is the short title of the Act, No. 36 of 2025, that replaced the Mahatma Gandhi National Rural Employment Guarantee Act (MGNREGA), 2005.
Parliament passed the Bill on 18-19 December 2025 and the President gave assent on 21 December 2025. The Act came into force across rural India on 1 July 2026; the date was notified on 11 May 2026. MGNREGA was repealed from the same day, with ongoing works and verified job cards carried over.
At least 125 days of unskilled manual work per rural household per financial year, against 100 under MGNREGA. From 1 July 2026 no notified wage is below ₹300 a day. Haryana has the highest general rate (₹409), and three high-altitude Sikkim panchayats get ₹450.
It is a Centrally Sponsored Scheme. Wages, material and administrative costs are shared 60:40 between the Centre and the States, 90:10 for the North-Eastern States and for Uttarakhand, Himachal Pradesh and Jammu and Kashmir, and fully by the Centre in Union Territories without a legislature. States alone pay unemployment allowance and delay compensation, and any spending above the Centre's normative allocation.
Section 6 requires each State to notify in advance a period of up to 60 days in a financial year, covering peak sowing and harvesting, when no works are run, so that farm labour is available. States can set different periods for different districts, blocks or panchayats. The 125-day guarantee is still owed in the rest of the year.
It is the State-wise amount the Centre fixes each year for the scheme (Sections 4(5) and 22(4)), on the recommendation of the National Level Steering Committee. Draft rules base it on the 16th Finance Commission's devolution formula plus a performance share. Critics say a fixed allocation, with States paying the excess, turns a demand-driven right into a budget-capped scheme. The Government says it makes funding predictable while the legal right to work stays.
375 permissible works, notified in October 2026, up from 266 under MGNREGA. They fall in four pillars: Water Security (128), Core Rural Infrastructure (111), Livelihood-related Infrastructure (98) and Special Works for Extreme Weather Events and Disaster Preparedness (38). An interim list of 318 works was used from 1 July.
Yes. Section 11 keeps it: if work is not given within 15 days of the application, the State pays at least one-fourth of the wage rate for the first 30 days and at least one-half after that. The Ministry says the Act also removes earlier disentitlement provisions.