The Ministry of Railways approved a maximum permissible speed of 100 kmph on the 111-km Katra-Banihal broad gauge section under the Jammu Division of Northern Railway.
The section earlier ran at 85 kmph between Katra and Sangaldan and 75 kmph between Sangaldan and Banihal.
The stretch is part of the Udhampur-Srinagar-Baramulla Rail Link, and includes 33 tunnels covering 87 per cent of the route.
It carries the Chenab Rail Bridge, the world's highest railway bridge, and the Anji Khad Bridge, India's first cable-stayed railway bridge.
Trials on the section had touched a peak test speed of 110 kmph on 8 January 2025, after a Commissioner of Railway Safety inspection of the Katra-Reasi segment.
Statutory authority that inspects and sanctions new railway lines, gauge conversions and speed increases before passenger traffic is permitted; also inquires into serious railway accidents
The zonal railway whose Jammu Division operates the Katra-Banihal section
GS Paper III > Infrastructure - railways; GS Paper I > Geography of India
General Awareness > Infrastructure and current affairs
General Awareness > Indian Railways - zones, divisions, major projects and safety authorities
General Awareness > Infrastructure and current affairs
The highest speed at which trains may run on a given section, sanctioned after assessment of track, signalling, structures and rolling stock.
A bridge whose deck is held by cables running directly to one or more towers; the Anji Khad Bridge is India's first of this type on the railway network.
Udhampur-Srinagar-Baramulla Rail Link, the 272-km project that connected the Kashmir Valley to the national rail network.